Homeowner guide
Stock door or special order, and what it does to the wait
Once the price is settled, the next question is when the door will actually be on the opening. The answer depends less on the calendar than on which of your choices the factory can pull from a standard run and which ones it has to build.
Late September is when a lot of Kay County homeowners decide the old door will not see another winter. The first norther is a few weeks out, the spring wind season was hard on the older sections, and a price is already in hand. Then comes the question nobody put on the quote. How long until it is up?
In a town where garage doors are made, people tend to assume the answer is “soon.” Sometimes it is. Whether it is for your door comes down to one split.
How long does it take to get a new garage door?
It depends on whether the door is a stock build or a special order. A door in a standard size, a common panel style and a stock color is a short wait, because it is a build the factory already runs. Anything made to your specification waits for its own slot. An honest time frame comes with the garage door installation quote, once the door is picked.
That is why a number given over the phone before anyone has seen the opening is worth very little. The same homeowner can hear two very different waits for what looks like the same door, because one version has a row of windows across the top and the other does not.
Every decision below lands on one side of that split or the other. Most households make four or five of them without ever being told that each one moves the date.
What makes a garage door a stock door?
A stock door is the one the factory builds in volume and the distributor keeps moving. Nothing about it has to be set up for your house. Stay inside all of these and the wait is mostly delivery and scheduling:
- A standard width. For houses that means 8 or 9 feet for a single car and 16 feet for a double.
- A standard height of 7 feet.
- A common panel profile, such as a short or long raised panel.
- A single-layer steel door or the maker’s regular insulated build.
- A stock color, usually white and a short list of browns and almonds.
- Solid top section, no windows.
Change any one line on that list and the door may still be easy to get. It has stopped being guaranteed.
What pushes a door into a special order?
A special order is anything the factory has to set up before it can build. Each item below adds a step, and the steps stack. Two of them on one door usually wait longer than one.
- An odd width, or an 8-foot height. The sections are cut to your dimensions instead of pulled from a standard run, and taller doors take longer tracks and a different spring as well.
- A custom color. Panels painted outside the stock range are a separate run from the regular colors.
- Window inserts. The top section is built with cutouts and the glass or acrylic is fitted before it ships, so the section cannot come off the regular line as-is.
- Carriage overlays and decorative hinges or handles. These are applied parts, and the door is assembled with them on.
- Wood of any kind. Wood doors are generally made to order, and a stain or paint finish adds its own drying time.
- Wind-rated assemblies. The heavier struts and reinforced tracks are specified for the door, which pulls it out of the standard build. The wind-load and bracing guide covers what the rating means.
- Low-headroom or high-lift hardware. The door may be ordinary, but the track and spring kit are not, and the door does not ship until both are ready.
A few of these are easy to give up once you know what they cost in time. A plain top section instead of windows is the most common one.
Does a door built in Ponca City come any faster?
Being near a door plant removes one of the three waits, not all of them. A new door waits on its build, on the trip from the factory to the installer, and on the installer’s schedule. A short trip shortens the middle one. It does nothing for a build queue or for how full the install calendar is.
That is the honest version of the local advantage. When a door does come from a plant close by, freight is a short drive instead of a long haul, and the wait between “built” and “in the shop” shrinks. The build itself still waits its turn with everybody else’s order, and a special order still waits longer than a stock one.
We do not know any factory’s schedule in advance and we have no side door into one. What we can tell you, once your door is chosen, is which side of the split it sits on and what the distributor says when the order goes in.
Does the clock start at the quote or at the measurement?
It starts when the order is placed, and the order should be placed after the opening has been measured in person. The sequence runs measure, order, schedule. Skipping the first step to save a week is how a door arrives an inch wrong or without the hardware the opening needs.
Most of the lost time on a replacement comes from reordering. A door built to a phone guess sometimes cannot be sent back, so the second order starts from zero. How we measure is laid out on the installation page, and it happens before anything is ordered.
What do you do with a garage you cannot close while a door is on order?
If the old door still opens and closes, keep using it until install day. Most doors headed for replacement are tired, not dead, and a door with a rusted bottom section or a dented panel still shuts the garage every night.
When it will not close, there are two ways to bridge the wait. A small repair on the old door, like a cable, a roller or a single section, is sometimes worth it to get a few more weeks of use, and we will say so when it is. For a door that is off its track or stuck with the car inside, the emergency repair page is the place to start.
If neither works, the opening gets closed as it is. Lower the door, lock it at the track, and pull the opener’s release so nobody runs the motor against a door that cannot move. An open garage exposes whatever is in it and, on an attached garage, the door into the house, so treat this as the last stop rather than the plan.
What should be settled before the order goes in?
Settle the handful of choices that decide the calendar first. Everything else about a door can be sorted out on the visit. These are the ones that send the order down one path or the other:
- The size, taken from the opening on the measurement visit.
- The panel style and color.
- Windows or a solid top.
- Insulated or single-layer.
- Whether the opener is staying. Most do, and what happens to the opener when the door is replaced covers the reset it needs.
Once those five are decided, what a new door costs installed and how long it will take can both be answered on the same garage door installation quote, in writing, before anyone signs. Blackwell, Tonkawa, Newkirk and Perry get the same sequence as Ponca City.